Yesterday they were pouring the concrete for the downstairs floor. Here they're working in the boys' bedrooms. |
The ecofoam is glued firmly in place, with perf board (not really a board) covering it and more waiting to be applied. |
Perf is draped over the waterproofing and ecofoam. The tarps on top are to minimize leakage into the structure, where the concrete floor is being poured. |
Tidak ada komentar:
Posting Komentar
Catatan: Hanya anggota dari blog ini yang dapat mengirim komentar.